You are reading a single comment by @Nef and its replies. Click here to read the full conversation.
  • I'm not able to go through the regs right now but I think it has something to do with properly earthing the sleeve of the SWA. Then you can lay it on beds in the garden so I can't see why it needs to be buried deep.

    On the other hand the whole job needs sign off from building control so whoever is doing that should be able to advise you:)

    Try searching the IET forum, I've found they are the best for electrical advice.

  • I tried the IET forum but it’s a pain to navigate.

    Electricians forum said there was no need for the conduit and laying it in a groove was totally fine.

    The supply SWA’s armour will be earthed as it comes out the supply DB (using a gland and a banjo, something along those lines).

    I’m just finishing my C and G 2365 level 2 and 3, so I have sufficient understanding to do the job. The practical experience is what I need to build - fairly handy, but electrical installation experience is clearly lagging behind other aspects. A course mate is a registered competent person so he’s agreed to sign it off. I’ll obviously do a full test to make sure it’s alright. And I’ll do the cable calcs beforehand for practise anyway.

    My main concern is that the Zs at the cabin DB will be too high and I’ll have to upgrade the SWA, or have to faff around with an earth rod. But otherwise should be straightforward.

  • I don't want to come across as aggressive but ask your registered competent mate :) If he's signing it off for you he will be able to answer the question easily enough.

    I'm qualified for installation but not registered so of course I get asked to do gardens all the time!

    I'm pretty sure I've been roughly where you are a few years ago. I had just done 2365 and wanted to do my own garden lighting. The conclusion I arrived at was SWA earthed at the glands and buried under cement and in my case tiles was fine. Where it comes out of the ground it is fixed to the walls and it's fixed to the walls for the majority of the run around the garden.

    I would ask your course tutor or mate for advice, or just ask the question on the IET site.

    I've not read this thread but it might have an answer :-

    https://www2.theiet.org/forums/forum/messageview.cfm?catid=205&threadid=81732&highlight_key=y&keyword1=swa%20depth

About

Avatar for Nef @Nef started