You are reading a single comment by @mespilus and its replies.
Click here to read the full conversation.
-
Thanks for the concern, but this was a long time ago, in my first ever place.
As I remember it, the old school plumber gave himself about four inches of working room,
from where the lead pipe emerged into the underfloor space,
(I had lifted several floor boards in the kitchen to give him all the access he needed).
Could you joint in your new pipe to the pipe just prior to the outside stop tap?