My bathroom floor is looking very tired, old boards with historic woodworm, but more worryingly this towel radiator has just been mortared in to the old hearth.
Realistically the proper solution here is to lift the boards, remove the hearth, and re-lay shower tray isn't it? Also is it sensible to have the shower tray on a plinth for pipe drop & service access?
Edit: oops meant to put this in the OyoH thread as I'll probably get someone in, there might be some DIY if it's simple enough.
My bathroom floor is looking very tired, old boards with historic woodworm, but more worryingly this towel radiator has just been mortared in to the old hearth.
Realistically the proper solution here is to lift the boards, remove the hearth, and re-lay shower tray isn't it? Also is it sensible to have the shower tray on a plinth for pipe drop & service access?
Edit: oops meant to put this in the OyoH thread as I'll probably get someone in, there might be some DIY if it's simple enough.
2 Attachments