• With the cabin weatherproof and watertight I was pretty keen to get all my tools and a workbench inside. But before filling it with crap I needed to get the floor done. But before getting the floor done I wanted to insulate and box on the ceiling, as this would probably be a messy and dusty job.

    I still had half a sheet of 100mm insulation left over from the floor and then I got really lucky and got a bunch more 100mm insulation from Freecycle. This would be enough to do the ceiling.


    1 Attachment

    • IMG_20200630_181651.jpg
About

Avatar for nick_warner @nick_warner started