Without using their plan builder, their standard suggestion is 2 blocks of 6 weeks of sweet spot base work, then a 8 week build block, then an 8 week specialty block.
If you followed this to the letter, its around 28 weeks, which would take you to summer.
That would be around 126h of turbo time on a low volume plan, and roughly equivilent of 4000km of specific training miles on the road.If you've followed the plan, there is no way you wouldn't be fitter at the end.
I thought VO2 max efforts were best bang for buck on limited training time? That’s what the Trainerroad plans suggest too.