Soon as the parquet flooring is done and fireplace cleaned in the front room, this for my hallway floor. I’ll be laying marine ply first. The skirting boards will stay on as it’s all a good fit for the pattern and tile sizes
A ton of jobs before that goes down though including stripping walls, timber wall panelling, radiator casing, chase electrics, recess light switch, Hat shelf with coat hooks.
Soon as the parquet flooring is done and fireplace cleaned in the front room, this for my hallway floor. I’ll be laying marine ply first. The skirting boards will stay on as it’s all a good fit for the pattern and tile sizes
A ton of jobs before that goes down though including stripping walls, timber wall panelling, radiator casing, chase electrics, recess light switch, Hat shelf with coat hooks.
1 Attachment