been a long journey to get here. here's what we have done in the two years since living here:
re-plastered three bedrooms upstairs
sanded and varnished boards upstairs
new master bathroom
new boiler
added 20 sqm extension and reconfigured full back of the house (including dropping floors down one level to connect back of house with the garden)
new electrics downstairs including consumer unit
new rear decking
new back garden fence and gate
converted old scullery kitchen to cloakroom/downstairs toilet
new kitchen
decorated downstairs hall (including tiling), cloakroom and new mass
treated downstairs boards for woodworm and replaced joists where required
installed wood burner
old living room (now adults' room) currently being replastered. once it has a new floor done and is redecorated, that's basically the last of the internal work (let's not talk about the loft or the basement). and don't ask me about the gardens either. thankfully the roof was fairly new (the only part of the property that had been upgraded in 25/30 years)
been a long journey to get here. here's what we have done in the two years since living here:
old living room (now adults' room) currently being replastered. once it has a new floor done and is redecorated, that's basically the last of the internal work (let's not talk about the loft or the basement). and don't ask me about the gardens either. thankfully the roof was fairly new (the only part of the property that had been upgraded in 25/30 years)