• next job in my house is to standardise all the door handles and light/electric fittings

    wonderful. I think most can only dream of getting that far down the list!

  • been a long journey to get here. here's what we have done in the two years since living here:

    • re-plastered three bedrooms upstairs
    • sanded and varnished boards upstairs
    • new master bathroom
    • new boiler
    • added 20 sqm extension and reconfigured full back of the house (including dropping floors down one level to connect back of house with the garden)
    • new electrics downstairs including consumer unit
    • new rear decking
    • new back garden fence and gate
    • converted old scullery kitchen to cloakroom/downstairs toilet
    • new kitchen
    • decorated downstairs hall (including tiling), cloakroom and new mass
    • treated downstairs boards for woodworm and replaced joists where required
    • installed wood burner

    old living room (now adults' room) currently being replastered. once it has a new floor done and is redecorated, that's basically the last of the internal work (let's not talk about the loft or the basement). and don't ask me about the gardens either. thankfully the roof was fairly new (the only part of the property that had been upgraded in 25/30 years)

About

Avatar for cozzzzzzzz @cozzzzzzzz started