  • Have drawings (I'll clean them up later so I can post them) and quotes.

    In essence:

    • Harvey Jones kitchen = £32k for cabinetry, fitting, painting, supply and installation of Miele appliances (about £9k of the cost).
    • Builders = £10-15k for clearing out everything, new boiler location and move of flue hole, floor tiling, new radiator installation, new fuse box, new electrics, new plumbing, painting. The variance in quote range here is due to an unknown, the floor tiles today don't go to the walls under cupboards and appliances and there's a risk any water leakage, etc may mean more major flooring works.

    This means £47k is the upper bounds of this quote.

    Not included:

    • Granite worktop, roughly 8m2 of granite @ £450 per sq m = £3.6k
    • Sink - No more than £500
    • Tap - No more than £600
    • Lights - No more than £250
    • Radiator - No more than £500
    • Tiles - No more than £500
    • Boiler - £1k
    • Dining table - £1k
    • 4 dining chairs - £150 ea = £600

    This means about £8.6k more in costs

    So I am probably looking at £56k for everything.

  • Given that you're going premium the estimates for things like lights, tiles, etc seem a bit low.

  • I'm just sticking with Hue for lights so process are known.

    Tiles are only £5.50 each and the cost of them is only £380... Estimating £500 is padding quite well.

    Feels realistic. I may be wrong.