• With that said, his video for the Enve show clearly states: ‘if you like the paint, get in touch’. As he’ll continue to offer it.

    Perhaps he’s away or something.

    I know you know all the guys and have probably considered them already but just in case you haven’t thought about everyone - how about these master frame builders?:

    Hampsten (unsure on wait - Ti frames welded by Max of 333fab)
    Kelly Bedford (~12-16 week wait)
    333fab (~16 week wait)
    Firefly (13 month wait)
    IF (~12 week wait)
    Bingham (~16 week wait - I know their branding is not as cool as Eriksen’s was, but they’re flexible on how they brand the frame)
    Strong (unsure on lead time)
    Holland (unsure on lead time)
    Sycip (unsure on lead time)

    Also - have you considered any Italian frames? The new Ti Stelbel is incredible. They’re at about 7 months.
    Bixxis could be worth a shout too. Unsure on time frame there for them. Not that long though.

About

Avatar for JB @JB started