Not really DIY but a nerve-wracking day in progress cutting, fitting and draw-boring mitres for a timber frame building. I'm terrified of cutting them too short as each sill is joinery grade larch that costs ~ £250 with a 3 week lead time. Bedding onto the stem walls (hopefully) tomorrow.
It's not too bad if you soak them in blade cleaner overnight when you've been cutting larch. I use a couple of drops of persil in a litre or two of water.
Not really DIY but a nerve-wracking day in progress cutting, fitting and draw-boring mitres for a timber frame building. I'm terrified of cutting them too short as each sill is joinery grade larch that costs ~ £250 with a 3 week lead time. Bedding onto the stem walls (hopefully) tomorrow.