You are reading a single comment by @JesperXT and its replies. Click here to read the full conversation.
  • The plan is to build a separate shed for bikes that currently live in the garage part.
    That frees up that space to move the junk that's stored in the other part out there. Then we'll begin building the workshop in the insulated part.
    At some point within the next 6-9 months we'll acquire the house next door along with 2 decent sheds. They'll get turned into regular storage which will free up the garage.
    When the garage is empty we'll do a concrete floor, insulate the walls and ceiling and put in an insulated garage door. Then the internal wall can be knocked down and we'll have the full space for the shop.

About

Avatar for JesperXT @JesperXT started