It's safe to say that cutting 100mm PIR can get in the sea
Ugh, the thought of it sends shivers down my spine. Nice idea with the tracksaw. With a dust extractor connected too? If I ever have to do that kind of thing again I'll give this a go. I found cutting to exact size too time consuming so I ended up deliberately undersized by 10mm and then expanding foamed around all the edges later.
Re the overhang, I'd consider making it a little longer if you don't have a compelling reason not too, it will really help keep the front of the building dry. With 365mm I think you'll get splashback from rain hitting the floor, and direct rain in mild wind.
Ugh, the thought of it sends shivers down my spine. Nice idea with the tracksaw. With a dust extractor connected too? If I ever have to do that kind of thing again I'll give this a go. I found cutting to exact size too time consuming so I ended up deliberately undersized by 10mm and then expanding foamed around all the edges later.
Re the overhang, I'd consider making it a little longer if you don't have a compelling reason not too, it will really help keep the front of the building dry. With 365mm I think you'll get splashback from rain hitting the floor, and direct rain in mild wind.