You are reading a single comment by @NotThamesWater and its replies. Click here to read the full conversation.
  • This weekend has been all floor.

    It's safe to say that cutting 100mm PIR can get in the sea - I bought a proper insulation foam saw, and really struggled to keep cuts vertical and straight.

    I ended up using my track saw, and doing a lot of outdoor vacuuming to keep the PIR dust down.

    Today I measured and dryfitted all of the T&G chipboard subfloor - I would have glued & screwed too, but my caulk gun snapped as soon as I tried to use it.

    Then it was a race to cover it up when it decided to rain particularly heavily.


    1 Attachment

    • IMG_20200627_163028.jpg
  • It's safe to say that cutting 100mm PIR can get in the sea

    Ugh, the thought of it sends shivers down my spine. Nice idea with the tracksaw. With a dust extractor connected too? If I ever have to do that kind of thing again I'll give this a go. I found cutting to exact size too time consuming so I ended up deliberately undersized by 10mm and then expanding foamed around all the edges later.

    Re the overhang, I'd consider making it a little longer if you don't have a compelling reason not too, it will really help keep the front of the building dry. With 365mm I think you'll get splashback from rain hitting the floor, and direct rain in mild wind.

About