Eriksen Sweetpost inbound from eBay for not much more than the J&L. A couple of minutes with a Scotch Brite pad and it should be as good as new.
I took a trip down to Del Mar to visit Summer Cycles again yesterday to talk over the frame drawings from Seven but unfortunately Craig had an emergency to deal with, so we hung out at a dog beach in San Diego instead:
Either way, the frame drawing will be probably be approved today over Zoom which means production will start almost immediately. Very stoked for this. I cannot wait.
Eriksen Sweetpost inbound from eBay for not much more than the J&L. A couple of minutes with a Scotch Brite pad and it should be as good as new.
I took a trip down to Del Mar to visit Summer Cycles again yesterday to talk over the frame drawings from Seven but unfortunately Craig had an emergency to deal with, so we hung out at a dog beach in San Diego instead:
Either way, the frame drawing will be probably be approved today over Zoom which means production will start almost immediately. Very stoked for this. I cannot wait.