• Depends which bit of land you mean! I grade off most of the land with my digger, which gets me 90% of the way there, the rest is done much more painstaking with a selection of rakes, starting with a foot wide metal with deep tines, then moving up to a 3ft wide with shorter metal tines and then finally onto plastic tines. It’s painful horrible work, but gives a good finish. Also helps that I have a laser level so can set that up and keep checking how I am getting on. In the past I have hammered pegs into the ground and used those.

  • But they are a lot of fun...

    Probably a better bet to get a good rake and smash some pegs in the ground in a 2m grid sadly.

About