You are reading a single comment by @Mr_Sworld and its replies. Click here to read the full conversation.
  • Really? That's annoying.

    Edit: I should elaborate. There's a window above and tile splashbacks either side. Would a fused spur in the open section next to it be adequate? I'm planning to have some non-fixed storage in here.

  • But as Kitchens are now a 'Special Location' any work is now Part P. Same as Bathrooms or Outdoor locations.

    So you need a Part P qualified Sparks to officially sign it off.

    This is bullshit BTW. I work regularly on Three Phase high amp systems as part of being an industrial / commercial sparks.

    While I don't need to be Part P to do that I can't actually do the same thing on my place without having someone else sign it off.

  • I'm sure it's complicated, but what constitutes a new installation then? Would moving sockets from the left to right of those appliances count? Or fitting a shallower patress box so I can fit a ducting reducer?

About

Avatar for Mr_Sworld @Mr_Sworld started