Bit of a shed (well, garage) renovation project on the go...
On Christmas Eve the silver birch at the bottom of my garden fell onto my garage
It properly fucked the roof
And covered everything in moss, broken branches and bits of asbestos
Tree surgeon came and chopped it into bits and got it off the roof
Which left me plenty of firewood:
(there was actually about twice this once I'd split the remains of the stump as well)
Had to winch the stump off the wall in order to get it cut down further
This is what was left after I'd emptied the garage into our cellar
Started to strip the old asbestos panels off. They're 40kg each and 2.8m x 1m, and I had to wear a mask while moving them and getting them wrapped so I could dispose of them.
Knocked out some of the blockwork so I could repair a some cracked joints
The ever expanding junk pile
The tree has a preservation order so will need replacing eventually
Got the last of the roof off and wrapped, and started to repair and strengthen the roof timbers
The junk pile, stump remains and wrapped asbestos all got collected. Good to have our parking space back.
Started to fit the replacement fibreglass roof panels
Fiddly but satisfying job. Needed to get some panels on as we're forecast rain for the first time in weeks tomorrow.
Once I've got the roof finished I'll move on to the electrics (more sockets!) and getting decent doors fitted.
Bit of a shed (well, garage) renovation project on the go...
On Christmas Eve the silver birch at the bottom of my garden fell onto my garage
It properly fucked the roof
And covered everything in moss, broken branches and bits of asbestos
Tree surgeon came and chopped it into bits and got it off the roof
Which left me plenty of firewood:
(there was actually about twice this once I'd split the remains of the stump as well)
Had to winch the stump off the wall in order to get it cut down further
This is what was left after I'd emptied the garage into our cellar
Started to strip the old asbestos panels off. They're 40kg each and 2.8m x 1m, and I had to wear a mask while moving them and getting them wrapped so I could dispose of them.
Knocked out some of the blockwork so I could repair a some cracked joints
The ever expanding junk pile
The tree has a preservation order so will need replacing eventually
Got the last of the roof off and wrapped, and started to repair and strengthen the roof timbers
The junk pile, stump remains and wrapped asbestos all got collected. Good to have our parking space back.
Started to fit the replacement fibreglass roof panels
Fiddly but satisfying job. Needed to get some panels on as we're forecast rain for the first time in weeks tomorrow.
Once I've got the roof finished I'll move on to the electrics (more sockets!) and getting decent doors fitted.