  • Each post held on with 130mm M10 coach screws (driven in by hand with a spanner as I don't have a 17mm socket) into the 2x6 joists that form the deck frame. Had to be creative with the top railing as Wickes for some reason didn't have the "correct" railing for these spindles so the top railing is actually two pieces.