You are reading a single comment by @Fishfabs and its replies. Click here to read the full conversation.
  • This is the finished frame sat back in the jig.
    You can spot a couple of low point in the brazing. I need to lay more brass on there. I couldn't be bothered to go back and build this up and I'll loose quite a bit in the primer. I'v got to remember this isn't the one-and-only... I need to make as many frames as possible to get better, so this could only be ridden for 3 months and then join the other one on the wall. No point going crazy with finishing - I only spent 2.5h sanding all the fillets. I didn't do much on the concave fillets ontop of the BB, that takes alot of work.
    The fillet sanding is something I have done alot before on other projects and is something I enjoy. I think my knuckles may think differently though.

    That's where I got to. Just waiting to get back to paint and for the bike shop to do the BB tapping/facing when they open. Tempted to buy the tooling but I'm not sure if the Icetoolz or similar BB kits are any good? Can't spend £500 on a Park Tool one - I know it's a good bit of kit, but it seems to have too much bike-tax added for me.


    5 Attachments

    • DSCF7125.JPG
    • DSCF7128.JPG
    • DSCF7130.JPG
    • DSCF7132.JPG
    • DSCF7136.JPG
About

Avatar for Fishfabs @Fishfabs started