I’ve got a new electricity meter cabinet arriving today so I can route our supply underground.
ENWL have been very specific about the ducting they want to bring the supply into the cabinet but I can’t get hold of the sparky I normally use to tell me what ducting I need to pre-instal into the concrete base for the armoured cable.
I’m guessing it’ll need to complete a circuit. So does that mean that the cable can come back through the same ducting from the consumer unit? Or do I need to put two lengths of ducting in?