Moving on from my last issue I now have to cut a series of dados to accept the louvres that will form the wall of the apple store.
Here I've run into a problem because I'd assumed (I know ass out of u and me) that the dados on neighbouring studs would line up and I could story pole it to mark and accurately place my template. This is not the case because not only do the dados on neighbouring studs not line up, there are irregular gaps between the dados in the first place so I'm going to have to do everything by eye to make sure it looks right, which will take a lot longer.
Moving on from my last issue I now have to cut a series of dados to accept the louvres that will form the wall of the apple store.
Here I've run into a problem because I'd assumed (I know ass out of u and me) that the dados on neighbouring studs would line up and I could story pole it to mark and accurately place my template. This is not the case because not only do the dados on neighbouring studs not line up, there are irregular gaps between the dados in the first place so I'm going to have to do everything by eye to make sure it looks right, which will take a lot longer.
2 Attachments