First things first, removing the old shed (and moving all the crap in side it into a storage unit)
The old shed was freecycled, and now live in North London somewhere.
The cat still lives here, but has lost a bed.
Then it's ground clearance time. After moving a load of paving, Ive discoved at least three separate concrete pours, all of very poor quality (meaning I only need the breaker on a couple of occasions), and 4 very deep concrete posts.
I also found a lot of waste metal, and old radio wrapped up in tree roots, an intact pot of poster paints, and a load of smashed windows.
Skip bags were initially the best option, but as I have discovered, I need to get rid of far more waste than I initially thought, so next week will be getting a skip.
First things first, removing the old shed (and moving all the crap in side it into a storage unit)
The old shed was freecycled, and now live in North London somewhere.
The cat still lives here, but has lost a bed.
Then it's ground clearance time. After moving a load of paving, Ive discoved at least three separate concrete pours, all of very poor quality (meaning I only need the breaker on a couple of occasions), and 4 very deep concrete posts.
I also found a lot of waste metal, and old radio wrapped up in tree roots, an intact pot of poster paints, and a load of smashed windows.
Skip bags were initially the best option, but as I have discovered, I need to get rid of far more waste than I initially thought, so next week will be getting a skip.