• We now have the brakes complete, the battery boxes have been re-instated and the fuse box/rev limiter/switch box made. the front roll cage has been removed (again!) to refit the orig dash and switches/guages and wire up.

    the big zorse has been ordered, along with the lexan side windows/slidy vents (overkill!), so we will at least look and sound pro at the back of the grid...

    exciting. i have three more days of study, then I am in a race to finish before the end of feb.


    4 Attachments

    • 6e26b40d-12be-467b-a7cd-ee9f03a116c4.jpg
    • 6e76ec14-2d82-4353-af92-1accba037897.jpg
    • 84d58d79-4ec6-42e0-b92e-b836a6f94e3d.jpg
    • fe3b0773-4a15-4749-9617-fdb428348ec0.jpg
About

Avatar for BRM @BRM started