Thanks both, agree the glacial progress is depressing and frustrating. With the K&C Town Hall being just off HSK I can imagine there are gaskets being blown left, right and centre at the thought of HSK being designated a TFL road.
And I cycled down from Swiss Cottage for the first time in ages yesterday, and that stretch is still a total bloody nightmare for cycling and driving, so I don't understand what delights the objecting locals are hoping to preserve, as is its bloody hideous.
Good luck @wildwest I hope this doesn't drag on for too much longer.
Well cs9..or rather cw9 will soon knock on the borough door, by ending at the Olympia.
The idea being eventually the public opinion will sway, when is anyone's guess.
With regards to Swiss cottage...sadly it will take a death before anything changes even then I'm not holding breathe.
Swiss Cottage is in Camden and the actual borough are quite keen to do something about it. It was only because it was bolted onto the doomed CS11 project that it didn't go ahead. No idea about current timescales though.
Thanks both, agree the glacial progress is depressing and frustrating. With the K&C Town Hall being just off HSK I can imagine there are gaskets being blown left, right and centre at the thought of HSK being designated a TFL road.
And I cycled down from Swiss Cottage for the first time in ages yesterday, and that stretch is still a total bloody nightmare for cycling and driving, so I don't understand what delights the objecting locals are hoping to preserve, as is its bloody hideous.
Good luck @wildwest I hope this doesn't drag on for too much longer.