You are reading a single comment by @Cornish_Bike and its replies. Click here to read the full conversation.
  • I usually budget around £35 psqm for materials (I might be a little out of date). Depending on the room shapes 80sqm could be 4 man days, it's the edges that take time. Those are really loose estimates.

    Refurbishment I wouldn't want to give an estimate without a close look at what needs to be done.

  • Thanks, floorboards are good TBH. Just need the gaps filled, sanded then painted / stained.

    It’s 3 rooms , Lounge (5x6), dinning room (5x5) and hallway (6x3).

About