You are reading a single comment by @Dugtheslug and its replies. Click here to read the full conversation.
  • 2.5m? You’ve loads of room then.
    Cross batten at 400 centres and then plasterboard and skim, takes out about 40mm of your available 2500.
    Battening creates a nice void for cables to be safely run in.

About

Avatar for Dugtheslug @Dugtheslug started