• #102
Damn, I'm likely going to try and put my own together, hoped you'd have some tips
-
• #103
Lots of inspo here
(https://forums.mtbr.com/frame-building/your-home-made-jigs-765202.html)
-
• #104
Jig arrived today.
Box weighed 42 kilo's. Nearly gave myself a hernia just carrying it to the shed.
Will unbox at the weekend.
-
• #105
What did you get?
-
• #106
I bought this:
Their idea of 'low-cost' and my idea of 'low-cost' = two different things.
-
• #107
Did you buy the mild steel lengths yourself?
-
• #108
I haven't done that yet.
I am aware that this fixture requires a bit of user-input to get it up and running, and that I need to fabricate (or cause to have fabricated) some bits out of mild steel.
Will do the 'un-boxing' at the weekend, and then see what has to be done.
Also, need to get a surface plate.
-
• #109
How’s the fixture looking?
Wanted
If anyone here has an old or surplus frame/fork/chainstay jig, dummy axles etc, I’d like to buy some stuff. I realise we have only hobbyists on here for the most part (the @coldharbour excluded) and are unlikely to have spares but shout if anyone sees anything too. -
• #110
Fixture is still in the box :(
It requires me to source a few lengths of box section steel to put it together, and work / parenting / life / poverty have all conspired to make me fail.
Must try harder.
-
• #111
Son I am disappoint
-
• #112
i might have some bits and bobs kicking about
-
• #113
Awesome, let me know what you got.
I've literally yesterday ordered a bunch of extrusion to build a jig but I would still be interested to hear of anything available -
• #114
its stuff from when i used to make jigs , people could yse the design and do what they wanted with it
-
• #115
Great, as I said, I'd be very interested to see what spare bits you've got
-
• #116
me too...
-
• #117
Finally got round to ordering the beams today.
Should arrive tomorrow or Wednesday.
Sorry for the delay ;)
-
• #118
Just to follow on from the above post - yesterday, after months of prevaricating, I ordered some bits of steel from The Small Order Metal Company in Southend.
They have just arrived at my workplace, less than 24 hours after I placed the order.
10 / 10, would use again.
-
• #119
Sorry for the delay ;)
You should be ashamed of yourself
Hurry up!
-
• #120
New grinder today. Big boy 1.2kW 10” wheels. It purrs.
1 Attachment
-
• #121
Nice.
But it’s so cold here today I’m mainly jealous of the radiator in the background 🥶 -
• #122
You do fabwork for a day job?
-
• #123
Ha! It’s getting scrapped before I bolt this fucker down. Never had central heating here. Our workshop is a basement, a bit like a wine cellar it seem to stay pretty temperate whatever’s happening outside. Just have to keep moving in winter.
-
• #125
Fantastic. Really really exceptional work there
Nah, this will be my first fixture of any significance.
Aiming to get more 'tooled up' this year.