Process began early on a Saturday morning, coffee, computer, sunrise, geometry
Identifying clearance parameters. I'll be running Omniums on this, with the well documented clearance issues they have (and my own locked out of reach in the velodrome) I spent a while double, tripple checking that I was working from accurate specs.
Then drawing everything out actual size along with some doodles on design and filleting
Process began early on a Saturday morning, coffee, computer, sunrise, geometry
Identifying clearance parameters. I'll be running Omniums on this, with the well documented clearance issues they have (and my own locked out of reach in the velodrome) I spent a while double, tripple checking that I was working from accurate specs.
Then drawing everything out actual size along with some doodles on design and filleting
Finalised geometry and buildmaster drawings