-
Like so:
So, this evening the engineers (for that is how the warning sign identified them) are working on a solution.
What they've done is they've dug a hole, ~75mm deep.
Into this hole, they've rawl-bolted the flange, so that the top of the flange is level with terra -firma.
They've then attached the pipe work, and buried the flange under ~75mm of asphalt.
So plan B differs from plan A by adding ~75mm of asphalt on top of the flange.
I'm not convinced that they are actually engineers, or that their solution will be in any way effective - given the ~1200mm of leverage afforded by the pipe work.
They got kicked down last saturday too, but were fixed pretty quickly it seems. I don't mind them personally but it does suck a bit since it was an awesome place to fly down at early morning/late night.