it would just be the red bits touching the metal - would these points of contact with the tape be enough? (minus the bolts) I have some gorilla tape double sided stuff, hopefully that'll work...
If you dont want to spent money on a new mount, I suppose you could drill two holes the same distance apart as the red bits on yours and then just bolt the thing on.
it would just be the red bits touching the metal - would these points of contact with the tape be enough? (minus the bolts) I have some gorilla tape double sided stuff, hopefully that'll work...