I pressed in a headset. Yay for me. Fitted the fork and stem.
I installed bottom bracket and crank set.
Wheels are in with the cassette mounted, just waiting for the lock ring tool.
Rear mech is attached.
Front brake is attached.
Thin tubing has been successfully routed through the top tube for guiding the brake cable.
I'm still waiting on seatpost, handlebars and a load of fiddly little things: correct length recessed nut, knock off campag 11s chain tool, down tube shifter boss cable guides, seat tube clamp bolt, valve caps that aren't fucking yellow, front mech clamp and necessary shim.
Progress has been made.
I pressed in a headset. Yay for me. Fitted the fork and stem.
I installed bottom bracket and crank set.
Wheels are in with the cassette mounted, just waiting for the lock ring tool.
Rear mech is attached.
Front brake is attached.
Thin tubing has been successfully routed through the top tube for guiding the brake cable.
I'm still waiting on seatpost, handlebars and a load of fiddly little things: correct length recessed nut, knock off campag 11s chain tool, down tube shifter boss cable guides, seat tube clamp bolt, valve caps that aren't fucking yellow, front mech clamp and necessary shim.