• I've booked a bike fit down in Glasgow on Nov 11 with Garry Kirk to sort out the setup on this.

    Is it likely that I'll have my 55cm frameset by then or should I reschedule?

  • I would say it is very likely, paint is going well, we are painting in batches of 3+3 with each batch taking 3 days, although there is going to be cross over of batches going forward. I tried to rewrite that sentence in a better way but failed.

    Tldr: should be fine, as long as there are no crises.

About

Avatar for deleted @deleted started