• 001 is done! (Apart from final steerer trim)
    Rear brake mount is faced and the rotor runs perfectly now. We had a short (1km) ride to check everything is roughly in the right place then hopefully a longer ride this week to make final adjustments before our trip to Italy at the weekend.

    Huge thanks to Matt and Caren for doing an awesome job, and for having the frame ready so we could pick it up when we were back in the UK. Harriet can't stop smiling!

    Due to the tiny bars and stem I had to cross the gear cables under the downtube, but the Thorn cable guide from SJS keeps the cables from rubbing on each other. Tester top cap looks ace as well, picture doesn't do it justice.

    Look forward to seeing everyone else's come together!


    2 Attachments

    • DA732DA4-4ED7-49FA-BDF8-2EF4A68017E1_1.jpg
    • IMG_7595_1.jpg
About

Avatar for chiroshi @chiroshi started