First building job done this morning. Put a bit of boiled linseed in the frame as a frame saver, and cut down the cable stops so they don't poke out of the bosses when wound fully in. Harriet is fairly determined to take part in all aspects of the build, so the rest will have to wait!
Unfortunately just got an email from bike24 to say that Hope are having "Brexit issues" and so wheels have been delayed.
First building job done this morning. Put a bit of boiled linseed in the frame as a frame saver, and cut down the cable stops so they don't poke out of the bosses when wound fully in. Harriet is fairly determined to take part in all aspects of the build, so the rest will have to wait!
Unfortunately just got an email from bike24 to say that Hope are having "Brexit issues" and so wheels have been delayed.