We are making piles of tubes, mitring starts this evening. Below is a break down of frames to be built. Looking at the tubes all in one place has made me realise what a lot of work it is going to be, especially considering Talbot stuff is still being built. After much backwards and forwards we have decided to build in batches of around 10, as we just don't have the space to do any bigger.
We built the dial-in number 001, happy with the set up, now it's just numbers. Going to be a very busy month, how fortuitous it is also school holidays!
We are making piles of tubes, mitring starts this evening. Below is a break down of frames to be built. Looking at the tubes all in one place has made me realise what a lot of work it is going to be, especially considering Talbot stuff is still being built. After much backwards and forwards we have decided to build in batches of around 10, as we just don't have the space to do any bigger.
We built the dial-in number 001, happy with the set up, now it's just numbers. Going to be a very busy month, how fortuitous it is also school holidays!
SIZE 47cm 49cm 51cm 53cm 55cm 57cm 59cm
QTY 0 1 0 10 13 10 3
HEAD TUBE 130mm 150mm 160mm 130mm 160mm 180mm 200mm
DROP OUT 58° 58° 58° 58° 70° 70° 70°
WHEELSET 650c 650c 650c 700c 700c 700c 700c