It's about this long, skip or bags can be the other side of the wall. Slabs coming up as well, I suppose the decision will depend on what's under the slabs.
Will be putting down a fresh membrane, some plastic grids and filling with pebble. New path will be slabs sitting atop the plastic grids to look like they are floating on the pebbles.
It's about this long, skip or bags can be the other side of the wall. Slabs coming up as well, I suppose the decision will depend on what's under the slabs.
Will be putting down a fresh membrane, some plastic grids and filling with pebble. New path will be slabs sitting atop the plastic grids to look like they are floating on the pebbles.
1 Attachment