  • The task begins. Phase 1 done. Room empty, polyfilla done, floorboards numbered.

    The plan: lift boards, reduce noisy heating pipes with felt tape, insulate pipes while I'm under there. Electrician fitting additional double wall socket with USB and network point (connecting to router downstairs under landing floor + extensive electrical works elsewhere). Redecorate, new carpet, new bed, move son back in.

  • Yay! Part of my novice plan... got the required stuff, had a dispenser. Was first going to sugar soap skirting/doors once electrician is done chasing the wires in, then undercoat walls/skirting before caulking gaps. Have seen varying preferences for decorating, start from top, skirting first, skirting last ...