You are reading a single comment by @LongAndWinding and its replies. Click here to read the full conversation.
  • The task begins. Phase 1 done. Room empty, polyfilla done, floorboards numbered.

    The plan: lift boards, reduce noisy heating pipes with felt tape, insulate pipes while I'm under there. Electrician fitting additional double wall socket with USB and network point (connecting to router downstairs under landing floor + extensive electrical works elsewhere). Redecorate, new carpet, new bed, move son back in.


    2 Attachments

    • IMG_7593.JPG
    • IMG_7594.JPG
About