The plan: lift boards, reduce noisy heating pipes with felt tape, insulate pipes while I'm under there. Electrician fitting additional double wall socket with USB and network point (connecting to router downstairs under landing floor + extensive electrical works elsewhere). Redecorate, new carpet, new bed, move son back in.
The task begins. Phase 1 done. Room empty, polyfilla done, floorboards numbered.
The plan: lift boards, reduce noisy heating pipes with felt tape, insulate pipes while I'm under there. Electrician fitting additional double wall socket with USB and network point (connecting to router downstairs under landing floor + extensive electrical works elsewhere). Redecorate, new carpet, new bed, move son back in.