1st worktop ready to go in. Cutting was a piece of piss! Is it worth sealing the back edge? It'll be sealed in under an upstand but wondered if it was common practice for diligence.
I used those X-shaped tile spacer things to ensure I got at least a couple of millimetres of Gripfil down the back. If your dextrous enough, I would suggest filling the void down the back with gripfil, then a neat triangular cross-section bead of sealant, 'this side' of the joint.
1st worktop ready to go in. Cutting was a piece of piss! Is it worth sealing the back edge? It'll be sealed in under an upstand but wondered if it was common practice for diligence.
1 Attachment