There's a cast iron soil pipe to replace, the floor needs a bit of work and getting the existing tiles off is going to be a bit of a nightmare (they're very well attached). Some boxing in for the concealed shower controls, but aside from that nothing particularly special. It's only being half-tiled.
Our lounge is at least 4x the size and was plastered in 2 days (first day prep, second day was an 8am-8pm plastering marathon) Paid £900 for that, so this does seem a little steep although the walls will probably need more prep than our lounge did.
There's a cast iron soil pipe to replace, the floor needs a bit of work and getting the existing tiles off is going to be a bit of a nightmare (they're very well attached). Some boxing in for the concealed shower controls, but aside from that nothing particularly special. It's only being half-tiled.
Our lounge is at least 4x the size and was plastered in 2 days (first day prep, second day was an 8am-8pm plastering marathon) Paid £900 for that, so this does seem a little steep although the walls will probably need more prep than our lounge did.