The repair itself to the pipe 2 3 days. I would assume full cutout. Pipe is too fractured to repair as i would its been leaking for a while. 250ML lost in 3 hours.
But the damage to the road as the tarmac has been lifted and in a few other places apparently probably see 2 weeks
Hahaha
Walking through the area yesterday, it looked to me like they had done a pretty damn good job of cleaning up and some side streets were without power.