Slowed down a bit with this as re-laying the floor took bloody ages. Have also got a floor tile design finished for the rear half of the room which we are having made into mats to make them easier to lay. Should get them down soon, but need to re-level the solid floor again to bring the height up. Anyway, fireplace now fitted and sealed in with bonding plaster.
Slowed down a bit with this as re-laying the floor took bloody ages. Have also got a floor tile design finished for the rear half of the room which we are having made into mats to make them easier to lay. Should get them down soon, but need to re-level the solid floor again to bring the height up. Anyway, fireplace now fitted and sealed in with bonding plaster.