You are reading a single comment by @stevo_com and its replies. Click here to read the full conversation.
  • The cold water pipe under my bath is leaking and I don't have any access (the bath panel is tiled on). The original plan was to regulate shower temperature on the boiler until I got the bathroom redone. This is starting to bug me so the plan is to take the side off, sort out the plumbing and replace with a cheap bath panel.

    The current tiled section looks like tiles stuck to a piece of ply attached to wooden battens. I assume that once I've removed the tiles/lump of ply and sorted out the plumbing then the panel can just be attached to the existing battens and sealant run around to finish.

    Sound like a plan or am I missing something?

  • That should be fine, just make sure the bath hasn't shifted or run some extra sealant around the wall join to be safe.

About

Avatar for stevo_com @stevo_com started