-
Yes, main bonding is often missing and has just become a reg. If you had said you needed main bonding to the meter/entry point for the gas it would have been less confusing. 10mm earth bonding surface mounted! Wouldn't get that past Mrs Airhead.
You do need it done though if you want a new CU. Going back to your original question, you can do it yourself, your electrician only needs to check the continuity. It should be one piece of cable, no joining allowed, so make sure you buy enough to reach.
The boiler is close to the entry for the gas pipes (in fact I think the only gas pipes are in the kitchen where the boiler is). This is what I got from the electrician.