-
http://www.lfgss.com/comments/9938274/
and the following comments.
Their main disadvantage is that they do not scabble to the width of the machine,
the one rive-gauche links to leaves 54mm at the edge,
and you wouldn't want to scabble your front door threshhold!Your 7(?)M^2 is only a couple hours work,
including your learning curve,
so you might be able to negotiate with the downstairs neighbour.
don't fuck around with half-arsed labour intensive methods, hire in a floor scabbler to level out the ramp and key the screed > http://www.astleyhire.co.uk/tools/products/concrete/floor-planer-scabbler-hire.html