You are reading a single comment by @Backstop and its replies.
Click here to read the full conversation.
-
The plan is for a 12 month trial one way. That is the current track goes one way East bound and the West bound carriageway goes bikes only. So one way eastbound only for cars. Which would simplify that junction.
Some details here https://www.lfgss.com/conversations/261192/
It is a shitty design, I hope they stop dragging it out and fix it soon. I reckon I've got fairies, I was very lucky to walk away unscathed this morning.
Thanks for the well wishes guyz!