• All the details are in the race manual

    CP 2: Strada dell’Assietta, Italy.
    Parcour: Sestriere to Suza via Strada dell’Assietta and descent of Colle della Finestre.
    Control: Sestriere
    Closes: 30th July
    The second checkpoint will require a traverse of the historic military ridge road, the Strada
    dell’Assietta. Some 40 km of gravel with much above 2,000m awaits riders at control number
    2 so a robust machine, possibly a little extra width on the rubber and good timing will be
    required to ensure safe passage over the parcour.
    CP2 will be staffed day and night from the time of arrival of the first rider until Thursday 30th
    July after which time riders will be required to self­validate as above.
    TCR staff will be stationed in Sestriere before the parcour and will advise on alternative
    protocol if the control becomes impassible due to adverse weather.

About

Avatar for andyp @andyp started