I think you are right. He had the foresight to cut the membrane large enough to allow him to flip the edges upwards and create a little pool for the levelling compound.
That I cannot do... so I am actually leaning towards doing something with brown packing tape around the legs of the kitchen units.
Yes?
You could use some damp course membrane, it is cheap enough stuck round the edge and formed in to an L shape so some goes under the new floor. You would need to stick the edge down to the floor and await it to seal. Would be a better finish than using packing tape.
I think you are right. He had the foresight to cut the membrane large enough to allow him to flip the edges upwards and create a little pool for the levelling compound.
That I cannot do... so I am actually leaning towards doing something with brown packing tape around the legs of the kitchen units.
Yes?