• Last night was great, really glad we all chipped in and got that long side fixed up. There's still work to do though. centre uprights next affixing on the long side boards, net poles need to go up, corner needs a rebuild, net rehung.

    I'm away from Saturday morning until Monday evening, Friday is the only evening I can do this week. Anyone free for that?

    1) do we want to buy any more of that black stuff when the guy in Peckham gets it in from woolwich this week? It looks very durable and doesn't need any extra treating from what I can tell. Presumably it's been out in the open for the last while but it's in VG condition.

    2 ) should we make the court one or two panels wider? We have the panels now to do it, and we can do it before we put the corner back on, and just insert a couple of extra panels in at the middle of the other end. We can't make it longer, making it wider will still increase the diagonal length (for those sweet long diagonal passes). I think there is sufficient net for this.

About

Avatar for dubkev @dubkev started